Lukas LKE 55 Manual do Utilizador Página 1

Consulte online ou descarregue Manual do Utilizador para Ferramentas Lukas LKE 55. Lukas LKE 55 User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 0
1
Operating Instructions
Rescue Tools
84150/7060-85 GB
Issue 02.2006
replaces 07.2005
Accu-tool
LKE 50 / LKE 51
LKE 55 / LKE 70
external accu 7 Ah
Vista de página 0
1 2 3 4 5 6 ... 14 15

Resumo do Conteúdo

Página 1 - Issue 02.2006

1Operating InstructionsRescue Tools84150/7060-85 GBIssue 02.2006replaces 07.2005Accu-toolLKE 50 / LKE 51LKE 55 / LKE 70external accu 7 Ah

Página 2 - Contents page

108.4 Opening of tool armsThe LKE 55 motor starts automatically when the star grip (1) is turned to either "opening" or"closing".

Página 3 - LKE 50 / LKE 51

119.2 SpreadingUse the frontmost area of the tips only for enlarging the gap. The maximum spreading force canbe applied if approx. 50% of the grooved

Página 4 - 3 General safety instructions

1210.5 Calibration of charger indication panelIf the external accumulator 7 Ah is frequently partially discharged, but then fully charged again, thepr

Página 5

13If the capacity of the installed accu constantly decreases despite proper charging, it must bereplaced by a qualified person.Maintenance adviceApply

Página 6 - 5 Applications

1415 Technical data*Weight (including oil filling, handle and carrier belt):Oil specifications: delivered with mineral oil HLP 10 DIN 51524 (closed oi

Página 7 - 7 Operation of LKE 70

1515.2 Central bolt / Tightening torque15.3 Noise emission15.4 OthersType LKE 50 / LKE 51 LKE 70 LKE 55Central bolt M 24 x 1.5 (SW 36)Torque Nm 100+10

Página 8 - 7.9 Charging the LKE 70

2Contents page1 Basic operation and designated use of the machine 42 Organizational measures 43 General safety instructions 44 Instructions for mainte

Página 9 - 8 Operating the LKE 55

36 7 81 4 5326 7 82 1 4351 Star grip2 Main switch3 LED indication panel4 Handle5 Socket 24 V6 Blade arms7 Central bolt withself-locki

Página 10

41 Basic operation and designated use of the machine1.1 The machine has been built in accordance with state-of-the-art standards and the recognizedsaf

Página 11

53.2 Make sure that nobody is at risk before starting up or setting the machine in motion and duringoperation of the machine.3.3 Before transporting t

Página 12 - 13 Preventive Maintenance

6Device-specific Information:Do not reach in between the blade arms!Do not cut electric wires!Cutting objects under tension (shock absorbers, springs,

Página 13 - 14 Troubleshooting

76.4 Close device (cutting)Turn rotary knob upwards and start the tool.The direction/operation process of the tool can be changed even when the tool i

Página 14 - 15 Technical data

87.5 Load holding function / dead man’s functionAs soon as the star grip is released it automatically returns to the neutral "zero" position

Página 15 - LUKAS Hydraulik GmbH

9When the charger is switched off or disconnected from its electric supply, the LKE 70 (or theexternal accumulator) must be disconnected from the char

Comentários a estes Manuais

Sem comentários